Topanga Lagoon Restoration plan shows a 200-foot bridge

Title

Topanga Lagoon Restoration plan shows a 200-foot bridge

Description

The Topanga Lagoon Restoration plan, Alternative #2, preferred by the Resource Conservation District, is superimposed on an aerial view of Topanga Beach. It shows...

- A 200-foot, Topanga Lagoon bridge
- The removal of 11.7 acres of earth, including the bluff, Old Malibu Road, and The Snake Pit
- The removal of all the businesses (or their relocation to a small space at left)
- A lifeguard tower built closer to PCH with a helipad
- Public parking structures built over Cholada Thai Beach Cuisine, Oasis Imports, and the Malibu Feed Bin
- A smaller parking lot
- Less street parking

Date

2021-02-27

Source

Resource Conservation District

Rights

Materials in this collection may be protected by the U.S. Copyright Law (Title 17, U.S.C.). In addition, the reproduction of some materials may be restricted by terms of Topanga Historical Society gift or purchase agreements, donor restrictions, privacy and publicity rights, licensing and trademarks. Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
⬆️ Up️
⬇️ Down️

Collection

Citation

“Topanga Lagoon Restoration plan shows a 200-foot bridge,” Topanga Historical Society Digital Archive, accessed November 8, 2026, https://topangahistoricalsociety.org/archive/document/3960.